This negotiated project has removed the need for road tankers to be used to deliver water to the seasonal maintenance fleet at Stowmarket
Following from the successful delivery of the Tonbridge Depot project, YJLi were asked to install a new 300m long water main, some bases and storage tanks at Stowmarket Depot.
This work required excavating of a trench through the length of the station car park and connection to the water main by the car park entrance.
The project was successfully delivered and has resulted in a reduction in the number of lorry movements in the local area.